PMCHY

PMCHY
The Dragging Equipment Detector at State Line, KY

Tuesday, March 3, 2020

Layout Track Plan Revisions

Revisions to Track Plan

 

Several changes have been made to the original track plan.  A portion of the mainline was originally on the back wall.  While the original plan worked, it offered a couple of scenic challenges the revised plan eliminates.  The return loop on the upper level was also removed, the staging tracks were made longer and the mill and chip loader were also eliminated for the time being.  The upper level passes over a aisle in two places.  The clearance beneath these points is 77.5", track level is 81" above the floor.



No comments:

Post a Comment